Overview
Stranded work
Nothing stranded No entities are marooned on quiet non-default branches.
Milestones
v0.11.0 — Unified Config & MCP Server 0/17
v0.12.0 — Plugin Unification & Hardening 0/0
v0.13.0 — Navigation 0/0
v0.14.0 — Design tokens contract + brand identity 0/0
v0.14.1 — Syntax token contract extension 0/0
v0.14.2 — Curated syntax preset lineup (Phase 1) 0/0
v0.14.3 — Navigation enrichment: slug resolution and richer dropdowns 0/0
v0.14.4 — Framework adapter parity with the SvelteKit reference 0/0
v0.15.0 — Composable embedding 0/0
v0.16.0 — Registry-driven sites 0/13
v0.17.0 — Declarative metadata & layout 0/0
v0.18.0 — Contract hardening 0/0
v0.19.0 — Polish, composability & rollups 0/4
v0.20.0 — Surface model: chrome, fills, cover layout & engine variants 0/0
v0.20.1 — Surface model: docs & showcase 0/0
v0.20.2 — HTML scaffold client runtime 0/0
v0.22.0 — Theme platform foundations 0/0
v0.23.0 — Surface axes & the skeleton/skin extraction 0/0
v0.24.0 — Live backdrops & scroll-reveal motion 0/0
v0.25.0 — Distribution & onboarding 0/0
v0.26.0 — Editorial reading & shared layout modes 0/0
v0.27.0 — External data & hosted content 0/0
v0.28.0 — Plan model hardening 0/0
v0.29.0 — Multi-language support (i18n foundation) 0/0
v0.30.0 — Plan lifecycle validation & render-stack removal 0/0
v0.30.1 — Transform engine facet decomposition 0/0
v0.31.0 — Section-role correctness and applicability as identity 0/0
v0.32.0 — Narrowed rune schemas 0/0
v0.33.0 — Generated reference docs 0/0
v0.34.0 — Content validation 0/0
v0.35.0 — Declarative schema.org mapping 0/0
v0.36.0 — Validation reach 0/0
v0.37.0 — Documentation drift 0/0
v0.38.0 — Rune transform consolidation 0/2
v0.39.0 — Declarations, part two 0/1
v0.40.0 — The first composed rune 0/0
v0.41.0 — Composed runes you can ship 0/0
v0.41.1 — Readable release notes 0/0
v0.41.3 — A fresh scaffold works 0/0
v0.42.0 — What a composition can express 8/8
v0.43.0 — Section is the composition base 8/8
v0.44.0 — Hero, cta and testimonial compose 14/14
v0.45.0 — Steps and the ladder 10/10
v0.46.0 — The theme contract 6/6
v0.47.0 — Quotations and the content model 9/9
v0.48.0 — Compositions go live 9/9
v0.9.0 — Universal Theming & Package Pipeline 0/0
v1.0.0 — Editor Integration & Package Ecosystem 0/16
Recent Activity
View all branch created on claude/v0.21-work-breakdown
146d agov0.21.0 created on claude/v0.21-work-breakdown
146d agoWORK-390 created on claude/v0.21-work-breakdown
146d agoWORK-389 created on claude/v0.21-work-breakdown
146d agoWORK-388 created on claude/v0.21-work-breakdown
146d agoWORK-387 created on claude/v0.21-work-breakdown
146d agoWORK-386 created on claude/v0.21-work-breakdown
146d agoWORK-385 created on claude/v0.21-work-breakdown
146d agoWORK-384 created on claude/v0.21-work-breakdown
146d agoWORK-383 created on claude/v0.21-work-breakdown
146d ago