WORK-387
ID:WORK-387Status:ready

Rune-doc drift guardrail

Frontmatter-driven catalogues can drift from code — add a defineRune without a doc page and it silently vanishes from the generated catalogue. Turn that into a build signal. Fast-follow to the catalogue work.

Priority:lowComplexity:simpleMilestone:v0.21.0Source:SPEC-092
claude/v0.21-work-breakdown View source

Criteria completion

Criteria completion: 0 of 2 (0%) checked; tracking started on Jun 11, no incremental history yet0%25%50%75%100%Jun 11Nov 4

Tracking started Jun 11 — check back for trends.

Branches 3
History 1
  1. 5a2b530
    Created (ready)by bjornolofandersson

Acceptance Criteria

  • A check (a refrakt inspect mode and/or a test) asserts every core defineRune and every plugin Plugin.runes entry has a corresponding /runes/<name> doc page, and flags doc pages with no backing rune.
  • Runnable in CI; a missing page is a clear failure naming the rune.

Dependencies

  • WORK-385 (establishes the /runes/<name> doc-page convention to check against).

References

  • SPEC-092 (drift guardrail) · refrakt inspect --list / refrakt reference (the existing programmatic catalogue)