Insights
Cycle time distribution
Time from first non-draft status to completion, across 132 completed items.
Throughput trend
Completions over the full history, bucketed daily.
Complexity calibration
Actual cycle time by planned complexity — is simple really simple? Are complex items over- or under-called?
Not enough tagged items yet (2 of 20 needed). The distribution gets reliable once more items have been completed with a complexity set.
Spec status flow & fan-out
Every spec with at least one derived work item, with its current status breakdown and a miniature status-flow chart showing how items moved through statuses over time.
SPEC-008 Unbuilt Runes — High-Level Spec
13 items 0% done
- pending 13
SPEC-043 Refrakt MCP Server
9 items 0% done
- draft 9
SPEC-031 Vite Plugin — Framework-Agnostic Rune Integration
6 items 0% done
- ready 5
- in-progress 1
SPEC-001 Community Runes — Specification
4 items 0% done
- ready 3
- in-progress 1
SPEC-002 Cross-Page Pipeline — Specification
4 items 0% done
- ready 4
SPEC-033 Structure Slots and Declarative Flexibility
2 items 0% done
- ready 2
SPEC-013 Multi-Framework Support: Layout Transform Architecture
1 item 0% done
- in-progress 1
SPEC-030 Framework Adapter System
1 item 0% done
- in-progress 1