BUG-024
ID:BUG-024Status:fixed

Four runes duplicate the sequence dimension, and which rule wins differs per rune

howto, recipe, steps and track each hand-roll a CSS counter that the sequence dimension already provides for them. The duplication is invisible because the output looks identical — but the two rules land at different specificities, so which one is actually in effect differs from rune to rune.

Severity:minorMilestone:v0.45.0Source:SPEC-137

The dimension already reaches all four

Each of the four declares sequence: in its config:

RuneConfigItems
HowToplugins/learning/src/config.ts:24author-written <ol> in the content region
Recipeplugins/learning/src/config.ts:69recipe.ts:218 — new Tag('ol', {}, steps)
Stepsplugins/marketing/src/config.ts:198steps.ts:166 — new Tag('ol', …), items tag: 'li' at :82
Playlistplugins/media/src/config.ts:16playlist.ts:354 — new Tag('ol', …), track.ts:210 is tag: 'li'

And annotateSequence (packages/transform/src/engine.ts:743) recurses into wrappers, so every one of those <ol> elements receives data-sequence="numbered" — including HowTo's, which the author wrote rather than the rune.

So skeleton/styles/dimensions/sequence.css is already styling all four. The per-rune counters are vestigial: they predate the dimension and were never removed.

The actual defect

Duplication alone would be harmless. The problem is that it is inconsistent:

[data-sequence="numbered"] > li::before    → (0,1,2)
.rf-step::before                            → (0,1,1)   dimension wins
.rf-track::before                           → (0,1,1)   dimension wins
.rf-howto__content ol > li::before          → (0,1,3)   bespoke wins
.rf-recipe__content ol > li::before         → (0,1,3)   bespoke wins

Both rules live in @layer skeleton, so the layer order does not disambiguate them and specificity decides. A theme author restyling [data-sequence="numbered"] > li::before therefore affects steps and track and is silently ignored on howto and recipe.

That is the dimension's whole promise — style once, every rune follows — failing quietly on half the runes that opted in.

Steps to reproduce

Render a howto and a steps on the same page with a theme rule that changes the marker, e.g.:

@layer skin { [data-sequence="numbered"] > li::before { content: "§"; } }

Expected

Both runes show §.

Actual

steps shows §. howto shows its number.

Fix

Delete the duplicated counter blocks:

  • packages/skeleton/styles/runes/howto.css — the .rf-howto__content ol reset, counter-reset: howto-step, and the > li / > li::before block
  • packages/skeleton/styles/runes/recipe.css — the equivalent recipe-step block
  • packages/skeleton/styles/runes/steps.css — counter-reset: step, .rf-step { counter-increment }, .rf-step::before
  • packages/skeleton/styles/runes/track.css — counter-increment: track and .rf-track::before

Keep everything genuinely rune-specific. track.css in particular is only half duplication: its row flex, cell flex sizing, ellipsis overflow and duration auto-push are the track's own inner geometry and stay.

Roughly 60 lines across the four files, with the skin counterparts following.

Note on the specificity arithmetic

The table above is computed by hand, not observed. The duplication is certain — four counters for a mechanism the dimension provides — and so is the fact that the two selector shapes differ. Which one wins in a real render should be confirmed in the gallery harness before the fix is called behaviour-preserving, since that determines whether removing the bespoke rules is a no-op (steps, track) or a visible change (howto, recipe).

Why this is filed against SPEC-137

Nothing detects this class of rot. packages/lumina/test/css-coverage.test.ts checks the forward direction only — that every generated selector has CSS somewhere. The reverse question, is this per-rune rule shadowing a dimension it should defer to, has no instrument. SPEC-137 builds one, and this bug is one of its two motivating cases.

Resolution

Completed: 2026-11-01

Branch: claude/milestone-v0-44-0-ism7ni · PR: refrakt-md/refrakt#748

What was done

  • Deleted the duplicated counter, marker and between-item rule from skeleton and Lumina howto.css, recipe.css, steps.css and track.css. Each rune keeps its own row spacing; track keeps its row flex and cells.

Notes

  • Checked with before and after screenshots. Playlist is pixel-identical. Howto and recipe now show the dimension's filled marker, which was invisible before because it matched the card background. Steps, howto and recipe take the dimension's compact indent (1.75rem), which their own skins had overridden with 2.25rem.
  • The bug's specificity table missed one thing: the skin layer outranks the skeleton layer, so the per-rune skins also decided the indent and the marker colour, not just specificity within skeleton.