Acceptance Criteria
- The 4
review items audited — WORK-293 and WORK-490 already carry ## Resolution sections (flagged by plan validate) and are likely done left stranded; WORK-346 / WORK-380 note "visual pass pending" so review may be legitimate — resolve each - The 2
in-progress items (WORK-051, WORK-089, both v1.0.0) checked for staleness and corrected if no longer active - The 1
blocked (WORK-430) and 5 draft items sanity-checked - A spot-check of the 28
ready items for entries that were quietly finished or abandoned plan validate reports no resolution-not-done warnings after the pass (or each is justified)
Dependencies
- WORK-493 — some corrections may use the new terminal statuses
References
- SPEC-117 — spec (Design Principles: retiring is not completing)
Resolution
Completed: 2026-07-09
Branch: claude/milestone-v0-28-0-llvtfa PR: refrakt-md/refrakt#565
What was done
- WORK-293 / WORK-490 were stranded in
review with complete resolutions — flipped to done (clears the 2 resolution-not-done warnings). - WORK-346 / WORK-380 confirmed legitimately
review (visual pass pending). in-progress/blocked/draft/ready surveyed — no further stranded items found. - Fixed 2 genuine duplicate-ID collisions surfaced by validate: frame-overflow
ADR-023 → ADR-026, authoring-scaffolds SPEC-116 → SPEC-118, with all references disambiguated by theme.